With over 150 attendees present, the final beam, painted white and signed by all project teams, was placed by crane on the pinnacle of the structure. Following tradition, a small evergreen tree was attached to the beam along with an American flag, symbolizing the continuing development of the project and wishing the building “good luck”.
With completion slated for June 2015, the new building will include steel construction, large floor plates, an on-site conference center, covered parking and a state-of the-art fitness center. The attractive exterior will feature curtainwall glass, terracotta rain screen and decorative metal panels, contributing to the building's green design and making it a top candidate to receive LEED Silver certification. Additionally, tenants of the building will have access to a 1,030-vehicle parking garage, which will be connected to the main office building by a raised 40,000-square-foot plaza.
The project team includes:
Studio 2112 — Landscape Architect
AHA Consulting Engineers — MEP Engineers
Simpson Gumpertz & Heger — Structural and Building Envelope Engineers
H.W. Moore — Civil Engineers
Acentech Inc. — Mechanical Noise and Acoustics Consultants
Entegra Development and Investment, LLC — LEED Consultants
Horton Lees Brogden Lighting Design — Lighting Designers
Sladen Feinstein Integrated Lighting — Lighting Designers