Skanska has topped out 17xM, an 11-story, 334,000-square-foot mixed-use development in Washington, D.C. The development has achieved WiredScore Platinum. The project is also targeting LEED Gold and Fitwel certifications. Milestones include an estimated 23,000 cubic yards of concrete used on the jobsite, an estimated 44,000 cubic yards of soil removed from the project site and a reduction of carbon by an estimated 20% with the Embodied Carbon in Construction Calculator tool. The building will include amenity spaces with integrated features, such as conference and event facilities, a rooftop deck and a private lower-level terrace. The design also incorporates a private vehicular … Read more
Final Steel Beam Set in Roof of New Los Angeles Clippers Arena
An important construction milestone was achieved as the final steel beam was installed in the roof of the Intuit Dome – the future home of the Los Angeles Clippers. Approximately 10,500 tons of structural steel in the bowl was erected in eight months. This includes seven roof trusses that each weigh 200 tons. Clippers’ team officials, including owner Steve Ballmer, the players and dignitaries including Inglewood Mayor James T. Butts, gathered for the signing of the final beam and ceremonial topping out of the Intuit Dome in Inglewood, California. Intuit Dome is a 1.3 million-square-foot, 18,000-seat NBA arena with five … Read more
New Learning Commons Provides Collaborative, Social Spaces
The new Learning Commons at Kettering University located in Flint, Michigan complements the university’s curriculum with a facility focused on collaboration, ideation and digital technology. The new 105,000-square-foot Learning Commons incorporates building systems that speak to the permanence and longevity of the institution, while offering durability for the decades ahead. The four-story design features an open-air atrium, and a skylight that fills the entire interior space with natural light. The first and second floors feature public gathering, dining and collaborative spaces, focused on creating dynamic social spaces for students. The third and fourth floors consist of additional collaborative spaces and … Read more
4 Bears Casino & Lodge in North Dakota Adds New 7-Story Hotel Tower
4 Bears Casino & Lodge will begin a major renovation, adding a seven-story hotel tower. The property is located on the western shore of Lake Sakakawea between Minot and Williston in New Town, North Dakota. The project team includes Wenaha Group, Kraus-Anderson and TBE Architects. The original 4 Bears Motor Lodge began in the 70s with 40 rooms. In 1993, a casino was added, followed over the years with various expansions and improvements, including restaurants, an event center, marina, RV park, water park, convenience store/car wash/liquor store and River Willow gaming boat. The overall $95-million project includes an 18,000-square-foot demolition … Read more
Bon Secours St. Francis Medical Center’s Renovation, Expansion Project Tops Out
The Bon Secours – St. Francis Medical Center’s renovation and expansion project in Midlothian, Virginia recently topped out. Construction includes renovations to existing spaces and the addition of two floors to help the hospital meet patient needs and provide more acute care services. Skanska is serving as general contractor. The expansion aspect of the project includes adding two floors above the existing surgical department, a new med-surg nursing unit with 24 beds, an additional intensive care unit with 24 beds and neonatal intensive care unit rooms. As part of the renovation of the existing building, the former ICU unit on … Read more