Ground Broken on 2-Story Expansion Project for SPR Packaging

Ground was recently broken on the SPR Office Building located in Rockwall, Texas. The project team includes MYCON General Contractors, Inc.; architect Pross Design Group and owner Alvaplast US Development, LLC. The SPR Office Building is a 24,000-square-foot, two-story expansion to the existing manufacturing warehouse. The project includes a formal lobby, offices and suites, architectural finished concrete features and preparation for the future locker room and bathroom. The scheduled completion date for the two-story office building is December 2020. MYCON is finishing the 79,373-square-foot North Warehouse on the same site.

Filed under: ProjectsTagged with:

Chicago Bears Unveils Halas Hall Expansion

The Chicago Bears recently unveiled the Halas Hall expansion, which included a 162,500-square-foot football operations addition to the already existing 143,000-square-foot facility and a 30,600-square-foot remodeling project on the northeast side of the building. The project broke ground in Lake Forest, Illinois, in March 2018. HOK was the design firm, Mortenson Construction was the general contractor and Corporate Concepts provided the furniture. As part of the project, a new player entry was designed with a hallway featuring all 14 of the Bears’ retired numbers, wall/ceiling lights that illuminate as players enter and music capabilities leading up to a 46-inch video … Read more

Filed under: eNews, ProjectsTagged with: , ,

Power Facility at Leading Research University Expanded, Upgraded

An essential expansion and upgrade to Arizona State University’s combined heating and power facility located in Tempe, Arizona, has been completed. The project effectively doubles the available electrical power for the ASU research community microgrid, while also doubling the steam capacity used for heating by both the research community and the Tempe campus distribution network. The CHPF allows ASU to be completely independent of the electrical grid if it ever needed to be, such as in the instance of a citywide power outage, ensuring that there is no disruption to millions of dollars’ worth of ongoing research. The CHPF expansion … Read more

Filed under: ProjectsTagged with: , , ,

Reno Orthopedic Clinic Expansion Serves as Flagship Location

Ground has been broken on a 76,000-square-foot addition to Reno Orthopedic Clinic in downtown Reno, Nevada. The four-story addition will connect to the existing 57,000-square-foot clinic. Upon its completion in fall 2020, the new facility will enhance the clinic’s services including physical therapy, with the addition of an advanced imaging center and the expansion of ROC Express Urgent Care, where patients can receive fast treatment with no appointment required. The facility serves as the only urgent care and orthopedic care site in Reno’s emerging downtown corridor. Increasing the amount of exam rooms by more than double, the new facility will … Read more

Filed under: eNews, ProjectsTagged with: , ,

Haselden Construction Breaks Ground on Holy Family High School

Haselden Construction recently broke ground on the expansion of Holy Family High School in Broomfield, Colorado. The 34,000-square-foot expansion will include eight new classrooms, a fitness center and auxiliary gym with expanded locker rooms and an enlarged cafeteria, allowing the school to grow from 690 students to 800 students. The expansion, expected to be completed in time for the 2019-2020 school year, will allow Holy Family to deepen its science, technology, engineering and math curriculum as well as offer robotics courses. The new gymnasium and fitness center will enable students and sports teams to practice during school hours, rather than … Read more

Filed under: ProjectsTagged with: ,