ROCKLAND, Mass. – Integrated Builders has recently completed its exterior renovation project at 205 Burlington Road in Bedford, Massachusetts, on behalf of Calare Properties, the building’s owner and operator. The firm provided construction management services while working with architectural design firm ci design, inc., to deliver an updated façade and overall improved look for the building.
The renovation plan at 205 Burlington Road included enhancements to the existing façade through the demolition and re-construction of the two exterior canopies and renovation of the two current entryways, one of which includes a vestibule. Additionally, Integrated Builders replaced the walkways, re-painted the doors and window frames and installed exterior insulation and finishing systems to provide an insulated, water-resistant, finished surface in an integrated composite material system.
205 Burlington Road is a 51,502-square-foot flex/office building situated near key workforce pools and less than 25 minutes from downtown Boston. With easy access to Route 3 and Route 128/I-95, the facility can accommodate a variety of tenants with a wide range of size and service requirements. Additionally, 205 Burlington Road sits just two miles from the Burlington Mall, a premier shopping destination featuring high-end retail stores and upscale restaurants, making the property a top destination for renters in search of premier space in the market.