Transport, Installation of Saudi Arabia Red Sea Project Assigned to Mammoet

Sheybarah Island by Killa Design (used with permission of TRSDC).

During a recent signing ceremony in Umluj, Saudi Arabia, The Red Sea Development Company, the developer behind a regenerative tourism project, and Mammoet, have signed the contract for Sheybarah Island Resort, a key part of the Red Sea Project in Saudi Arabia.

Sheybarah hotel is a 73-key hyper-luxury resort on Sheybarah island, located in the south east of the archipelago on the Red Sea. The island is home to a highly diverse environment with mangroves, white sand dune beaches and some of the most beautiful and pristine coral reefs in the world hosting many species of fish and other marine animals.

The resort comprises uniquely shaped overwater and beach villas, arrival, front of house and other facilities. The approach to the façade design was to minimize visual impact of the architecture on the environment by employing a highly reflective polished stainless steel cladding that reflects the natural surroundings: the ocean, sky, sand dunes and reef below.

The villas are being manufactured offsite by Grankraft Industries. Under the scope of the contract, Mammoet is commissioned to deliver 73 prefabricated villas from Grankraft’s yard to the site and install them onto their foundations — on the beach and over water.

The resort will embrace the latest sustainable technologies in all elements of its design; an eco-friendly and sustainable design that not only preserves but enhances the biodiversity and the surrounding natural habitat’s environment, while offering a luxurious experience that will attract visitors from around the globe and elevating Saudi Arabia as a top tier marine eco-tourism destination.

Sheybarah Resort is a LEED Platinum off-grid, zero-energy, zero-water development that widely promotes sustainable design in every aspect of its environment, to ultimately create a hospitality benchmark for regenerative developments. It is powered by a centralized solar farm, and fresh water is supplied from a solar-powered desalination plant. The recycling of waste material takes place on the island, which minimizes the need to bring or remove materials from or to the island.

Overwater villas being fabricated by Grankraft Industries, Sharjah, UAE.

 

Filed under: Around the World, eNewsTagged with: , , , , , ,