Turner Construction Begins Renovating Boulder High School

802075a0-5e6b-411b-8331-1c05acd8425e

Turner Construction Company’s Special Projects Division has begun a significant renovation of Boulder High School in Boulder, Colorado. Originally constructed in 1937, the 246,000-square-foot facility will undergo a series of interior, exterior and site improvements.

Interior improvements include renovations to the backstage area and dressing rooms, band area, kitchen, cafeteria and restrooms. The project also includes the repair/replacement of interior doors, HVAC, communications systems and fixtures such as casework and stage rigging. Improvements to interior finishes such as curtains, ceilings, carpet, flooring and paint and asbestos abatement will also be performed. Existing library and cafeterias will be transformed into modern welcoming centers that will serve dual purpose as learning centers and “heart” gathering spaces. Existing band space will be changed into a modern band space with break out rooms for ensembles.

Health and physical development improvements will consist of stadium renovations including bleachers, press box, field house, multi-purpose fitness room and tennis court repair.

Safety and security improvements include the redesign of the main entry to provide more control over visitor access, replacement/addition of exterior cameras, installation of electronic security controls including exterior door sensors and installation of security partitions.

Sustainability initiatives include upgrades to lighting and HVAC controls and replacement of an aged boiler with a more efficient condensing type as well as replacement of aged roof top ventilation units, and individual room air handler units. Also aged inoperable windows will be replaced with energy-efficient units; site improvements to include fencing, drainage and paving.

Exterior building improvements include repair/replacement of windows, doors and roof and paint and repair of stonework.

Filed under: ProjectsTagged with: , , ,