Open store remodels and construction are complete on new Minute Clinic/HealthHUB clinics at CVS Pharmacy locations in Leawood, Kansas; Chattanooga, Tennessee and St. Louis, Missouri. The projects included constructing new Minute Clinic/HealthHUB clinic rooms, waiting room, pharmacy consultation room and a group sales room. Knoebel Construction was the general contractor on the $350,000 project.
Each 10,000-square-foot CVS location also was modernized with new finishes, including paint, flooring, millwork, brand signage and shelving. Since acquiring Aetna in November 2018, CVS Heath is conducting significant expansion of HealthHUB locations at CVS Pharmacy stores across the country.
The primary project challenge was completing construction within a fully operational store. A plastic enclosure was installed to keep the store clean and safe to the general public during construction. Knoebel collaborated with CVS’s vendors, store team and merchandise teams to minimize disruption. The project team worked during the day, as well as the evening, to meet the fast-track, three-month schedule.
The architect for the St. Louis location was Architectural Design Guild. Massa Multimedia Architecture was the architect for the other locations.