
Clark Construction, Akridge, and National Real Estate Development have reached final construction completion of Phase One of The Stacks, a 1.1-million-square-foot mixed-use development in Capitol Riverfront’s Buzzard Point neighborhood in Washington, D.C. This milestone marks a major step forward in the neighborhood’s development, with the delivery of the three residential mixed-use towers and public spaces.
Phase One of The Stacks includes The Byron, a 14-story, 384-unit apartment building; Everly, a 14-story, 413-unit apartment building and Colette, a 13-story, 319-unit building. The development provides a combined 1,100 rental apartment units, 40,000 square feet of retail, 300,000 square feet of below-grade parking, plus a 22,000-square-foot park. A key part of the development is the pedestrian-only path running through the heart of the project that guides people from the nearby Audi Stadium to the Anacostia waterfront. Dubbed ‘The Corso,’ the path curves gently through the length of The Stacks.
Launch Workplaces, an 11,000-square-foot coworking and flexible office space, and FLEX, a 10,000-square-foot community gym concept by Balance Gym and FLEX—Buzzard Point, are the newest tenants at The Stacks, adding to the new community’s live-work-play lifestyle.
At final build-out, The Stacks will consist of 2 million square feet of mixed-use space, including over 2,000 residential units, 80,000 square feet of retail and restaurant space and a 15,000-square-foot park along V Street.


Join our thriving community of 70,000+ superintendents and trade professionals on LinkedIn!
Search our job board for your next opportunity, or post an opening within your company.
Subscribe to our monthly
Construction Superintendent eNewsletter and stay current.