Virtual Design & Construction on the Bellvue Water Treatment Plant – Package B Project and Beyond

On the $25-million Bellvue Water Treatment Plant – Package B project, Hensel Phelps built a virtual as-built of the project through the use of laser scanning technology. The virtual as-built was used to provide the owner, the city of Greeley, an exact replica of the plant for future use. Hensel Phelps also used the virtual as-built model to print a physical model (pictured above). The physical model provides an exact replica of what was built for a more traditional view that does not require a computer. Laser scanning can be performed as the project progresses, and can be utilized for … Read more

Filed under: TechnologyTagged with: ,