Modjeski and Masters Wins Third Contract from NCDOT

RALEIGH, N.C. – Modjeski and Masters has been selected for the Structures Management Unit Support – Limited Services Contract with the North Carolina Department of Transportation.

Under this contract, Modjeski and Masters will perform bridge design, bridge preservation design, working drawing reviews, vessel collision and fender design, structure utility attachment design, load ratings and structural, electrical and mechanical design, inspection and rehabilitation of movable bridges on an as needed basis for NCDOT’s bridge program.

This selection marks the third contract win this year for Modjeski and Masters from the NCDOT including its fourth consecutive Movable Bridge On-Call contract and an Emergency Express Design-Build Bridge Replacement contract. Dating back to the 1976 design of the Isabel Holmes bascule bridge, Modjeski and Masters has continued to work closely with NCDOT over the past four decades.

Filed under: ProjectsTagged with: , ,