Construction Complete on Zero Carbon-Ready Building in Ontario

Construction is complete on a new industrial property on Mississauga Road in Mississauga, Ontario (Canada). Ware Malcomb provided architectural design services for the 270,738-square-foot industrial building, located on a redeveloped 14-acre site.

The industrial project, known as Meadowvale South, was developed by CanFirst Capital Management on behalf of CanFirst Industrial Realty Fund VII LP. The project features a 40-foot clear building height, 42 dock-level doors, two grade-level doors, 50-foot-wide by 54-foot-deep bays and a 60-foot staging bay. The site accommodates parking for 226 cars, including 12 EV charging stations, as well as 37 trailer parking stalls.

LEED Gold certification is being pursued based on design features such as improved natural lighting and air quality in the warehouse, improved water efficiency inside and outside the building, and was engineered to support the installation of solar panels. The project is also considered zero carbon-ready, meaning the building can operate with net-zero carbon emissions in the future, without requiring significant retrofits.

General contracting services for the building were provided by Cecchini Group.

Photography: Philip Castleton Photography

 

Filed under: eNewsTagged with: , , , ,