Scotland Footbridge Pirouettes into Place

Recent drivers using Scotland’s busiest motorway were the first to drive under the new iconic footbridge successfully installed by BAM Nuttall. The 14-hour closure of the M8 motorway commenced with BAM Nuttall, and specialists Mammoet, driving the main span of the 2,420 ton structure down the M8 and into its final location. Moving the unusually shaped 58-meter hourglass structure required meticulous planning to manage a range of challenges. In preparation for the lifting operations, extensive overnight work was required. A range of temporary works were designed to ensure the motorway and other assets were protected. Joseph McBride, sub agent, discussed … Read more

Filed under: Around the World, eNewsTagged with: , , ,