Sixth Street Viaduct Replacement Shifts to New Construction from Demolition

LOS ANGELES, Calif. – Skanska its joint-venture partner Stacy and Witbeck will begin construction of foundations for the new Sixth Street Viaduct in Los Angeles, California, this this month. This is a significant milestone for the project which, until now, has primarily consisted of the demolition of the previous structure. Foundation work will commence immediately and conclude late in 2017. Numerous foundations will be drilled, utilizing thousands of cubic yards of concrete and millions of pounds of reinforcing steel. This work will be followed by construction of the distinctive “Y” columns and the viaduct superstructure. HNTB is the designer of … Read more

Filed under: ProjectsTagged with: , , ,

BNBuilders Awarded $23.8M UCLA Geffen Academy Project

SAN DIEGO, Calif. – BNBuilders was recently awarded the $23.8-million Geffen Academy project on the campus of UCLA in California. Geffen Academy is a new college preparatory school for students in grades 6-12 from across the greater Los Angeles area, including children of UCLA faculty and staff. The new school, which is also the first K-12 facility awarded to BNBuilders Southern California office, will offer a world-class education to more than 600 students when it opens in late 2018. The Geffen Academy will be located in the existing 75,000-square-foot, three-level Kinross Building. The Kinross Building was built in 2002 as … Read more

Filed under: ProjectsTagged with: , ,

Sundt Breaks Ground on $36M Student Housing Complex for University of the Pacific

STOCKTON, Calif. – Sundt Construction, Inc. broke ground earlier this month on a new student housing complex for the University of the Pacific in Stockton, California. The $36-million project is being developed by Capstone Development Partners, a private student housing developer known for partnering with colleges and universities to develop student housing that supports the student experience. Expected to be complete by early 2018, the project includes the development of two new four-story buildings totaling 158,000 square feet and housing 381 beds. The new residences will provide contemporary apartment-style housing with gathering spaces and other indoor and outdoor student amenities, … Read more

Filed under: ProjectsTagged with:

Construction of Cincinnati Children’s/UC Health Proton Therapy Center Complete

HOUSTON, Texas and CINCINNATI, Ohio – Linbeck Group and Messer Construction Co. has completed the Cincinnati Children’s/UC Health Proton Therapy Center in Ohio, the second facility of its kind in the world owned by a children’s hospital. The total cost of the project is $120 million. The two-story, 89,549-square-foot facility features a vault to house the 9 ton, super-conducting cyclotron system and three treatment bays, or gantries, with additional space for a fourth bay to be built when needed. When the Proton Therapy Center opens in August 2017 it will be the only facility in the country with a gantry … Read more

Filed under: eNews, ProjectsTagged with: , ,

IWR North America Performs Restoration Work on Trump International Hotel

IWR North America, formerly IWR Building Systems, recently completed work on the Trump International Hotel in Washington, D.C. IWR-NA was brought on as a specialty contractor to perform restoration work associated with the exterior enclosure upgrades as part of the renovation. IWR-NA’s scope of work included upgrades to entry facades and canopies with modern materials, new acoustical cladding systems at the mechanical screen walls and installation of high-end panel systems in the entrance portals. Under an expedited time frame that, at times, required 12-16 hour work days for a grand opening on Sept. 12, the pre-planning and hard work started … Read more

Filed under: eNews, ProjectsTagged with: