Student Village to Provide Expanded Spaces for University of London Growing Student Population

Royal Holloway, University of London, has appointed Balfour Beatty as preferred bidder for the development of a student village in Egham, Surrey (England). In partnership with Royal Holloway under a 50-year concession contract, Balfour Beatty will design, build, finance and operate, alongside Student Living by Sodexo, a new 1,400-room student village at Rusham Park. In addition, the company will operate the existing 621-bed George Eliot student accommodation complex in London. Bringing together expertise from across the group, the company’s UK Construction Services business will be responsible for the construction of the new student village. As part of the c.£130-million Design-Build … Read more

Filed under: Around the World, eNewsTagged with: , ,

New Building Advances Engineering Education, Research at Duke

Construction is complete on the 150,000-square-foot Wilkinson Building for the Pratt School of Engineering at Duke University in Durham, North Carolina. Skanska USA served as general contractor on the project, which will house new engineering, education, research and entrepreneurship initiatives that bring together departments, faculty and students from across the university. The five-story concrete structure, which expands spaces dedicated to student education and programming in engineering by 50%, was built using Duke stone and Duke-blended face brick. These two materials are key elements of the architectural identity of Duke’s West Campus and have been used throughout the school to create … Read more

Filed under: ProjectsTagged with: , ,

New Educational Facility to Enhance Ongoing Revitalization Efforts in Pawtucket

The Pawtucket, Rhode Island School Department has selected Gilbane Building Company to provide construction management at-risk services for the new 93,964-square-foot Henry Winters STEAM Elementary School. Designed by the SLAM Collaborative, the new educational facility will feature three levels and accommodate 643 students in grades pre-kindergarten through fifth. The school will be built on the 2.60-acre site of the old facility, which was demolished in the spring of 2020, and is situated in a thickly settled, urban neighborhood. The Gilbane team has developed strict safety and logistical measures to ensure minimal disruption to the surrounding community, including rerouting large trucks … Read more

Filed under: ProjectsTagged with: ,